Traditional scaffolding used in the re-bricking process in many steel factories was replaced by Ladle lifts as a safer and more reliable
option. Refractory firebrick in pour ladles require continual replacement and
the Handling Specialty ladle lift was designed as the perfect solution. The
lift is loaded into the ladle using a crane, and can be moved to the next ladle
requiring re-bricking. These two stage scissor lifts are designed to withstand
harsh melt shop environments, improving efficiency in the factory.
This custom model also includes three sets of aluminum
extensions which connect on the lip along the outside of the platform. Each
extension allows for larger size ladles to be re-bricked, whether oval or
round.
The heavy–duty scissor lift raises and lowers the operator
and bricks via a hand-held controller for ease of operation while handling
loads of up to 10,000 lbs. The lift is loaded into the ladle using a crane, and can be moved to
the next ladle requiring re-bricking.
No comments:
Post a Comment